Question: QUESTION 1 a ] Requested daily quantity for a product is 5 0 0 units ( defect free ) . The production times ( given

QUESTION 1a]
Requested daily quantity for a product is 500 units (defect free). The production times (given as normal time) of the two operations respectively are as follows: Operation a=2min? unit; Operation b=10min? unit. The defect rates is given as 20% for Operation a and 30% for Operation b in serial. Workers assigned to these operations will accomplish the conversions. The performance of the individual employee are expected to be 90%. There are two scenarios:
Scenario I: With Rework
Although the defect rates are given, no product is permitted to leave the plant with any quality defects. Accordingly, all of the defects must be corrected, and the average time to correct the defect is 150% of the initial conversion time. The same work teams will accomplish this rework. The plant is run as a one-shift 8hr? day (meal break of 30min (unpaid); Short Breaks 215min; downtime=45min) operation.
\table[[,\table[[With],[Repair]],\table[[Without],[Repair]]],[Availability %,,],[Flficiency %,,],[Q(Initial-starting amount of unit)=unit/shift,,],[Takt time(min/unit),,],[WL (min/shift),,],[Performance Level (%),,],[Revized Cycle (min/unit),,],[AT=Available time per person (Performance considered)=min/person,,],[Revized Cycle (Considering worker performance)(min/unit),,],[Officiency of the line (Performance of the line)=%,,],[FY/TPY,,],[EO unit/shift,,],[PDF1%,,],[PDF2%,,],[NT min/unit,,],[Assignment of the operations to the stations:,,],[ST (with PDF1) min/unit,,],[ST (with PDF2) min/unit,,],[SO= unit/shift per employee,,],[EO= unit/shift,,],[If the cost per operator is 10$/hr and the cost of defective unit (material),,],[Under this conditions which Scenario is the best in respect to unit cost?,,]]
Draw a sketch showing the station-operator assignment (With & Without Repair)
Prove the FY/TPY of your new redesigned station assignment (With & Without Repair)
QUESTION 1b): If there is a 10% of Efficiency Improvement (not temporary it's permanent) what will the effect on OEE? (Hint: OEE; w; Assignment etc)
QUESTION 1c) If there is a 10% of Efficiency of the line (=Performance of the line)(by using an incentive system based on perfomance) what will the effect on OEE? (Hint: OEE; w; Assignment etc)
Prove the TPY of your new redesigned station assignment
 QUESTION 1a] Requested daily quantity for a product is 500 units

Step by Step Solution

There are 3 Steps involved in it

1 Expert Approved Answer
Step: 1 Unlock blur-text-image
Question Has Been Solved by an Expert!

Get step-by-step solutions from verified subject matter experts

Step: 2 Unlock
Step: 3 Unlock

Students Have Also Explored These Related General Management Questions!