Question: Question 1 a . What is a raise? b . What is the purpose of a raise? [ 5 ] c . Briefly explain the

Question 1
a. What is a raise?
b. What is the purpose of a raise?
[5]
c. Briefly explain the methods of developing a raise
[S]
d. What are the basic advantages of raise boring methods?
[5]
[5]
Question 2
a. Explain the common form of materials transport in open pit mining
[5]
b. List the factors that influence the selection of load and haul equipment
[5]
c. Given that the annual production of coal required in one mine is 60 million BCM. The mine is planning to operate two shovels of the same size to attain the required production. Select the bucket size for each shovel given the following information
Estimated Work Cycle =122 seconds
Operating days a year =344
Operating time/day =22 hrs
Swell factor =1.2
Dipper/bucket Fill Factor =0.7
availability and utilization =0.8
Note: Average Bucket Payload = Heaped Bucket Capacity Bucket Fill Factor
Question 1 a . What is a raise? b . What is the

Step by Step Solution

There are 3 Steps involved in it

1 Expert Approved Answer
Step: 1 Unlock blur-text-image
Question Has Been Solved by an Expert!

Get step-by-step solutions from verified subject matter experts

Step: 2 Unlock
Step: 3 Unlock

Students Have Also Explored These Related Civil Engineering Questions!