Question: QUESTION 1 Based on project information on kitchen space renovation as prepared below, fill in the time estimates (t), activity variances (V) and answer all

QUESTION 1 Based on project information on

QUESTION 1 Based on project information on kitchen space renovation as prepared below, fill in the time estimates (t), activity variances (V) and answer all questions: Activity Predecessor Time Estimates (in weeks) V a A Optimistic Most Likely Pessimistic 4m b 9 10 11 8 10 18 B A 9 8 13 D 7 8 15 E 4 B 2 6 6 7 F D 5 G B, C 2 1 (0) Construct the AOA node network. (ii) Construct the AON node configuration network. (iii) Based on the AON node configuration network above, fill the information in the table as provided below: Activity Early Start Early Finish Latest Start Latest Finish Slack A B D E F G (iv) Determine the project's completion time

Step by Step Solution

There are 3 Steps involved in it

1 Expert Approved Answer
Step: 1 Unlock blur-text-image
Question Has Been Solved by an Expert!

Get step-by-step solutions from verified subject matter experts

Step: 2 Unlock
Step: 3 Unlock

Students Have Also Explored These Related General Management Questions!