Question: QUESTION 1 Based on project information on kitchen space renovation as prepared below, fill in the time estimates (t), activity variances (V) and answer all

QUESTION 1 Based on project information onQUESTION 1 Based on project information on

QUESTION 1 Based on project information on kitchen space renovation as prepared below, fill in the time estimates (t), activity variances (V) and answer all questions: Activity Predecessor Time Estimates (in weeks) V t Optimistic | Most Likely Pessimistic a 4m b 9 10 11 A B 8 10 18 8 A 9 13 A 8 7 15 E B 2. 4 6 6 7 F D 5 G 2 B, C 1 (i) Construct the AOA node network. (ii) Construct the AON node configuration network. (iii) Based on the AON node configuration network above, fill the information in the table as provided below: Activity Early Start Early Finish Latest Start Latest Finish Slack A B D E F G (iv) Determine the project's completion time. (v) Determine the critical path of the project. (vi) Determine the probability that the project will be completed in 23 weeks, 25 weeks and 27 weeks

Step by Step Solution

There are 3 Steps involved in it

1 Expert Approved Answer
Step: 1 Unlock blur-text-image
Question Has Been Solved by an Expert!

Get step-by-step solutions from verified subject matter experts

Step: 2 Unlock
Step: 3 Unlock

Students Have Also Explored These Related General Management Questions!