Question: QUESTION 1 Once the total station has been set up on the traverse point, the first thing that the operator will do is Measure the

QUESTION 1
Once the total station has been set up on the traverse point, the first thing that the operator will do is Measure the height of the instrument
Measure the distance to the foresight
Calculate the double angle
All the above
QUESTION 2
To backsight a point the operator will center the cross hair on the prism by locking and turning. the horizontal lock and fine motion screw
the vertical lock and fine motion screw
all the above
none of the above
QUESTION 3
After placing the cross hair on backsight prism, the operator will measure a distance to the backsight by pressing on the numerical pad. 2
1
0
F1
QUESTION 1 Once the total station has been set up

Step by Step Solution

There are 3 Steps involved in it

1 Expert Approved Answer
Step: 1 Unlock blur-text-image
Question Has Been Solved by an Expert!

Get step-by-step solutions from verified subject matter experts

Step: 2 Unlock
Step: 3 Unlock

Students Have Also Explored These Related Civil Engineering Questions!