Question: QUESTION 11 A production line is to be designed for a job with three tasks. The task times are .3 minutes, 1.4 minutes, and .7

QUESTION 11

  1. A production line is to be designed for a job with three tasks. The task times are .3 minutes, 1.4 minutes, and .7 minutes. For a single production line with no parallel activities, the minimum cycle time in minutes is:

    .3.

    .7.

    1.4.

    2.4.

    .8.