Question: QUESTION 11 DBR (Drum-buffer-rope) is a planning and control system that regulates the flow of work-in-process materials at the bottleneck or the capacity constrained resource

QUESTION 11

  1. DBR (Drum-buffer-rope) is a planning and control system that regulates the flow of work-in-process materials at the bottleneck or the capacity constrained resource in a productive system.

    True

    False

QUESTION 12

  1. Managers should produce products with the highest contribution margins or unit sales, provided they have market demand for them no matter what results the manager gets from the traditional method or bottleneck method.

    True

    False