Question: Question 2 ( 1 point ) The resource with the q , blank is the bottleneck in a process with multiple types of flow units.

Question 2(1 point)
The resource with the q, blank is the bottleneck in a process with multiple types of flow units.
A) highest implied utilization
B) lowest capacity
C) highest capacity
D) lowest implied utilization
 Question 2(1 point) The resource with the q, blank is the