Question: Question 2 10 Points A Serial Manufacturing system is composed from 3 machines. Parts arrive from the warehouse using an automated system, the time between

Question 2 10 Points A Serial Manufacturing
Question 2 10 Points A Serial Manufacturing system is composed from 3 machines. Parts arrive from the warehouse using an automated system, the time between arrival is exactly 45 minutes. The parts go to machine 1, that has a processing time Expo(3) minutes. Then they move to machine 2 that has a processing time of TRIA(1,4,7,4.8) minutes. Parts then go to a machine that label the product, this takes uniformly between 24 and 26 minutes per product. Run the system for 40 hours, do 10 replications. Model the system using ARENA and select all the correct statements related to the system. Machine 2 is the bottleneck station The throughput of the system is 11 parts/hr The average WIP is 2.98 parts The average value added time is 10.77 minutes The average waiting time is 453 minutes The throughput of the system is 74 parts/hr o Machine 3 is the bottleneck station The 95%. Cl for the average total time for a part is (12.44- 14.4) minutes The average number of parts waiting for machine 3 is only due to its low variability, The average number of parts waiting for machine 3 is small processing time and also due to its low variability Question 2 10 Points A Serial Manufacturing system is composed from 3 machines. Parts arrive from the warehouse using an automated system, the time between arrival is exactly 45 minutes. The parts go to machine 1, that has a processing time Expo(3) minutes. Then they move to machine 2 that has a processing time of TRIA(1,4,7,4.8) minutes. Parts then go to a machine that label the product, this takes uniformly between 24 and 26 minutes per product. Run the system for 40 hours, do 10 replications. Model the system using ARENA and select all the correct statements related to the system. Machine 2 is the bottleneck station The throughput of the system is 11 parts/hr The average WIP is 2.98 parts The average value added time is 10.77 minutes The average waiting time is 453 minutes The throughput of the system is 74 parts/hr o Machine 3 is the bottleneck station The 95%. Cl for the average total time for a part is (12.44- 14.4) minutes The average number of parts waiting for machine 3 is only due to its low variability, The average number of parts waiting for machine 3 is small processing time and also due to its low variability

Step by Step Solution

There are 3 Steps involved in it

1 Expert Approved Answer
Step: 1 Unlock blur-text-image
Question Has Been Solved by an Expert!

Get step-by-step solutions from verified subject matter experts

Step: 2 Unlock
Step: 3 Unlock

Students Have Also Explored These Related General Management Questions!