Question: Question 2 2 0 2 . 1 The D & E Groups manufactures two electrical products: Product A and Product B . both products undergo

Question 2
20
2.1 The D & E Groups manufactures two electrical products: Product A and Product B. both products undergo assembly process of wiring and drilling. Each Product A takes 3 hours of wiring and 2 hours of drilling. Each Product B must go through 2 hours of wiring and 1 hour of drilling. During the next production period, 240 hours of wiring time are available, and up to 140 hours of drilling time may be used. Each Product A sold yields a profit of R25.00. Each Product B assembled may be sold for a R15 profit.
I. Formulate and solve this LP production mix situation.
II. Find the best combination of Product A and Product B that yields the highest profit using the corner point graphical approach.
2.2.D and E Groups' management realizes that it forgot to include two critical constraints. Management decides that there should be a minimum number of Product A produced to fulfil a contract. Also, due to an oversupply of Product B in the preceding period, a limit should be placed on the total number of Product B produced.
2.2.1 If D&E groups decides that at least 20 Product A should be produced but no more than 80 Product B should be produced.
I. What would be the optimal solution?
II. How much slack or surplus is there for each of the four constraints?
2.2.2 If D & E groups decides that at least 30 Product A should be produced but no more than 50 Product B should be produced.
I. What would be the optimal solution?
II. How much slack or surplus is there for each of the four constraints at the optimal solution?
 Question 2 20 2.1 The D & E Groups manufactures two

Step by Step Solution

There are 3 Steps involved in it

1 Expert Approved Answer
Step: 1 Unlock blur-text-image
Question Has Been Solved by an Expert!

Get step-by-step solutions from verified subject matter experts

Step: 2 Unlock
Step: 3 Unlock

Students Have Also Explored These Related General Management Questions!