Question: The D & E Groups manufactures two electrical products: Product A and ProductB. both products undergo assembly process of wiring and drilling. Each Product Atakes

The D & E Groups manufactures two electrical products: Product A and ProductB. both products undergo assembly process of wiring and drilling. Each Product Atakes 3 hours of wiring and 2 hours of drilling. Each Product B must go through 2 hoursof wiring and 1 hour of drilling. During the next production period, 240 hours of wiringtime are available, and up to 140 hours of drilling time may be used. Each Product Asold yields a profit of R25.00. Each Product B assembled may be sold for a R15 profit.I. Formulate and solve this LP production mix situation. (3)II. Find the best combination of Product A and Product B that yields the highestprofit using the corner point graphical approach. (9)2.2. D and E Groups management realizes that it forgot to include two criticalconstraints. Management decides that there should be a minimum number of ProductA produced to fulfil a contract. Also, due to an oversupply of Product B in the precedingperiod, a limit should be placed on the total number of Product B produced.2.2.1 If D & E groups decides that at least 20 Product A should be produced but nomore than 80 Product B should be produced.I. What would be the optimal solution? (3)II. How much slack or surplus is there for each of the four constraints? (1)2.2.2 If D & E groups decides that at least 30 Product A should be produced but nomore than 50 Product B should be produced.I. What would be the optimal solution? (3)II. How much slack or surplus is there for each of the four constraints at the optimalsolution?

Step by Step Solution

There are 3 Steps involved in it

1 Expert Approved Answer
Step: 1 Unlock blur-text-image
Question Has Been Solved by an Expert!

Get step-by-step solutions from verified subject matter experts

Step: 2 Unlock
Step: 3 Unlock

Students Have Also Explored These Related General Management Questions!