Question: QUESTION 2 3 A new development is planned for a community, but it is in watershed adjacent to the watershed served by the existing wastewater

QUESTION 23
A new development is planned for a community, but it is in watershed adjacent to the watershed served by the existing wastewater treatment plant. To transport the wastewater to the wastewater treatment plant, a lift station is needed to pump the wastewater over a ridge to an existing interceptor in the existing collection system. The interceptor has sufficient capacity for the estimated 4.6 MGD peak flow from the new development.
B. Design the lift station with two pumps. The influent sewer pipe to the lift station has an invert elevation of 1472.15, the top of the lift station has an elevation of 1486.00, the submersible lift station pumps have a minimum submergence of 4 feet with motors rated for 10 starts per hour, and the wet well has a diameter of 12 feet. Set the high-water alarm such that backup of the sewer does not occur before an alarm sounds and that it sounds if the pumps cannot keep up with the incoming flow. The design will use float switches for water level sensing, so set 1 foot minimum between each float level for operation of the pumps. The bottom elevation of the wet well floor then is most nearly:
a)1458.49
b)1459.49
c)1460.49
d)1461.49
d)1461.49
c)1460.49
a)1458.49
b)1459.49
QUESTION 2 3 A new development is planned for a

Step by Step Solution

There are 3 Steps involved in it

1 Expert Approved Answer
Step: 1 Unlock blur-text-image
Question Has Been Solved by an Expert!

Get step-by-step solutions from verified subject matter experts

Step: 2 Unlock
Step: 3 Unlock

Students Have Also Explored These Related Civil Engineering Questions!