Question: Question 2 6 pts A Scraper utilized on a project has a heaped capacity of 3 1 LCY . The material will swell 2 5

Question 2
6 pts
A Scraper utilized on a project has a heaped capacity of 31 LCY . The material will swell 25%, shrink 9% and has an in-situ or bank weight of 100lbs? cuft. How much does the material weigh in lbs/ccy (round your answer to the nearest pound)?
Question 3
6 pts
A Scraper utilized on a project has a heaped capacity of 31 LCY . The material will swell 31%, shrink 8% and has in in-situ weight of 100 lbs/cuft. How many BCY will fill the Scraper (round your answer to the nearest tenth of a cubc yard)?
Question 2 6 pts A Scraper utilized on a project

Step by Step Solution

There are 3 Steps involved in it

1 Expert Approved Answer
Step: 1 Unlock blur-text-image
Question Has Been Solved by an Expert!

Get step-by-step solutions from verified subject matter experts

Step: 2 Unlock
Step: 3 Unlock

Students Have Also Explored These Related Civil Engineering Questions!