Question: Question 2 (a) A manufacturing system have four work stations. The process flow, time taken for each work stations are shown in Figure Q2(a). In

Question 2 (a) A manufacturing system have four

Question 2 (a) A manufacturing system have four work stations. The process flow, time taken for each work stations are shown in Figure Q2(a). In work station S3, product may go through either S3-4 or 53-6. Using constrain management concepts answer the following questions. How long it will take for the product to complete the process? Which individual work station will be the bottleneck in this system? How many products per hour will be processed in work station S3? How many products per hour can be produced in this system? S3-a (15 minutes Si (10 minutes S2 (8 minutes S4 (9 minutes S3-b (10 minutes Figure Q2a) [5 mark] 6) A baking company in Kuala Lumpur has four retail outlets in the city. Currently each retail outlet makes their own breads and pastries from scratch. In order to reduce cost and ensure consistency of their products across all locations, the management decided to build a central bakery. Where the product will be prepared and subsequently distributed to the four outlets. Find the central bakery location using center of gravity method? Table Q2(b) Location - Coordinate Y - Coordinate Quantity of Outlet product sold | 125 100 1250 B 250 175 3000 C 450 200 12750 | 200 350 (1500 (5 mark]

Step by Step Solution

There are 3 Steps involved in it

1 Expert Approved Answer
Step: 1 Unlock blur-text-image
Question Has Been Solved by an Expert!

Get step-by-step solutions from verified subject matter experts

Step: 2 Unlock
Step: 3 Unlock

Students Have Also Explored These Related General Management Questions!