Question: Question 2 A continuous time study was conducted in a job that contains four elements. The observed time and performance ratings of 7 cycles are

Question 2 A continuous time study was conducted

Question 2 A continuous time study was conducted in a job that contains four elements. The observed time and performance ratings of 7 cycles are shown below: Use 2 decimal places. Element 1 2 3 4* Rating Factor 92% 88% 1 0.44 1.99 2.83 3.93 *Irregular element performed every 12 cycles 112% 115% 2 0.49 2.2 b. Compute the standard time for the job. 2.95 3.97 Observations / Cycles (min) 4 5 0.62 0.67 3.4 4.3 4.54 3 0.53 2.35 3.15 4.2 2.98 3.85 4.32 6 0.75 3.9 4.92 4.94 7 4.86 4.4 5.2 5.15 a. Given a workday allowance of 10% allotted for an 8-hr operation, compute the personal allowance in minutes, given the following additional data: Unavoidable delay = 20 mins; Lunch break = 60 mins; Personal allowance = 20

Step by Step Solution

There are 3 Steps involved in it

1 Expert Approved Answer
Step: 1 Unlock blur-text-image
Question Has Been Solved by an Expert!

Get step-by-step solutions from verified subject matter experts

Step: 2 Unlock
Step: 3 Unlock

Students Have Also Explored These Related General Management Questions!