Question: Design a PLC program and prepare a typical I/O connection diagram and ladder logic program that will execute the following control circuit correctly: Turns
Design a PLC program and prepare a typical I/O connection diagram and ladder logic program that will execute the following control circuit correctly: Turns on a timer when a switch is closed (pre-set value of timer is 10 s). . . Resets timer automatically through a programmed transitional contact when it times out. . Counts the number of times the timer goes to 10 s. Resets counter automatically through a second programmed transitional contact at a count of 5. . Latches on a light at the count of 5. Resets light to off and counter to 0 when a selector switch is closed.
Step by Step Solution
3.55 Rating (162 Votes )
There are 3 Steps involved in it
INOO HH START CROM HH TH IN003 CRO18 HH ... View full answer