Question: Question 22 (1 point) A Jack-in-the-box toy includes two components, the jester (part A) and the box (part B). The following flowchart demonstrates its manufacturing

Question 22 (1 point) A Jack-in-the-box toy

Question 22 (1 point) A Jack-in-the-box toy includes two components, the jester (part A) and the box (part B). The following flowchart demonstrates its manufacturing process. Production of Part A A1 A2 C.1 C.2 B.1 3.2 B.3 Production of Part B Final assembly It takes two steps, A.1 and A.2, to make part A, performed by two dedicated workstations, respectively: A.1 has a process time of 3 minutes; A.2 has a process time of 8 minutes. It takes three steps, B.1, B.2, and B.3, to make part B, performed by three dedicated operators, respectively: B.1 has a process time of 6 minutes; . B.2 has a process time of 7 minutes; B.3 has a process time of 3 minutes. After both parts are produced, they will be combined together to form the final product through the final assembly operations. This step takes 10 minutes and is performed by either of the two parallel workstations, C.1 and C.2. Note that C.1 and C.2 perform identical operations and each unit of product requires just one of them for 10 minutes. What is the process time of this manufacturing process (in minutes)? Keep 1 decimal place if your answer is not a whole number

Step by Step Solution

There are 3 Steps involved in it

1 Expert Approved Answer
Step: 1 Unlock blur-text-image
Question Has Been Solved by an Expert!

Get step-by-step solutions from verified subject matter experts

Step: 2 Unlock
Step: 3 Unlock

Students Have Also Explored These Related General Management Questions!