Question: Question 3 [ 1 4 pts ] ( a ) [ 4 pt ] If the length of the critical path is 4 0 minutes

Question 3[14 pts](a)[4 pt] If the length of the critical path is 40 minutes and the average waiting time in the system is 10 minutes, determine the systems:
i. theoretical flow time (TFT)=
ii. average flow time (T)=
iii. flow time efficiency =
iv. What should the average waiting time be in order to have a flow time efficiency of 90%?
(b)[2 pt] Describe the bullwhip effect in a precise and brief manner.
(c)[2 pt] Does panic ordering impact the bullwhip effect? If yes, briefly explain how (e.g., increase or decrease?) and why.
(d)[6 pt] Consider the Burrito Game and its facility location type formulation. Suppose there are 5 potential sites for burrito trucks (i.e., the blue circles).
i. Describe the decision variables (i.e., variables to change on Excel Solver).
ii. How many decision variables does your formulation have?
iii. You decide to use only two trucks, which you locate at sites 1 and 3. Provide the values of the decision variables for this solution.
iv. Does this facility location problem have the total unimodularity property, and if so, what are the practical implications of this property?

Step by Step Solution

There are 3 Steps involved in it

1 Expert Approved Answer
Step: 1 Unlock blur-text-image
Question Has Been Solved by an Expert!

Get step-by-step solutions from verified subject matter experts

Step: 2 Unlock
Step: 3 Unlock

Students Have Also Explored These Related General Management Questions!