Question: QUESTION 3 3.1 Develop a bill of material for a bicycle. (4) 3.2 Below is the product structure tree for product AA100. The master production

QUESTION 3 3.1 Develop a bill of material for a bicycle. (4) 3.2 Below is the product structure tree for product AA100. The master production schedule and the inventory status report are shown below. Develop a material requirements plan (MRP) for the product to cover a six-week planning period. (Use the appended table on page i to answer the question). [TURN OVE 5 EPT1601 Master Production Schedule
Step by Step Solution
There are 3 Steps involved in it
Get step-by-step solutions from verified subject matter experts