Question: Question 3 : Perimeter design ( 4 0 marks ) A platinum mine in the Limpopo Province is experiencing problems with the final pit wall
Question : Perimeter design marks
A platinum mine in the Limpopo Province is experiencing problems with the final pit wall in that several small, localized slope failures have occurred during the last few months. The Group Geotechnical Engineer GGE has been tasked to revisit the drill and blast designs and asked for your assistance.
On visiting the mine, you obtain the following blast parameters:
Explosive Products:
ANFO
Emulsion mm x mm cartridges
g boosters
Shocktube msec x m
Shocktube assemblies: msec x m & msec x m
Presplit: mm holes, degree inclination m vertical depth
Splitting factor: kgm
Hole spacing: m
Production Blast holes:
Hole diameter mm; m hole length vertical; stemming m; subdrill m
B x S: m x m standoff to presplit m; minimum of rows
Step by Step Solution
There are 3 Steps involved in it
1 Expert Approved Answer
Step: 1 Unlock
Question Has Been Solved by an Expert!
Get step-by-step solutions from verified subject matter experts
Step: 2 Unlock
Step: 3 Unlock