Question: Question 3: Ring blast design -40 marks Referring to the attached diagram, design a drilling, charging, and timing layout for the dimensions given. Calculate the

Question 3: Ring blast design -40 marks Referring to the attached diagram, design a drilling, charging, and timing layout for the dimensions given. Calculate the actual metres drilled, explosives required, initiation system required and the actual powder factor. Use an initial powder factor of 1.0kg/m3. Based on basic design principles, show all the construction lines, and motivate your decisions. Please make use of basic principles for the layout / design. Calculate the cost per m3 for the design, based on the following costs
Step by Step Solution
There are 3 Steps involved in it
1 Expert Approved Answer