Question: Question 3: Ring blast design -40 marks Referring to the attached diagram, design a drilling, charging, and timing layout for the dimensions given. Calculate the

 Question 3: Ring blast design -40 marks Referring to the attached

Question 3: Ring blast design -40 marks Referring to the attached diagram, design a drilling, charging, and timing layout for the dimensions given. Calculate the actual metres drilled, explosives required, initiation system required and the actual powder factor. Use an initial powder factor of 1.0kg/m3. Based on basic design principles, show all the construction lines, and motivate your decisions. Please make use of basic principles for the layout / design. Calculate the cost per m3 for the design, based on the following costs

Step by Step Solution

There are 3 Steps involved in it

1 Expert Approved Answer
Step: 1 Unlock blur-text-image
Question Has Been Solved by an Expert!

Get step-by-step solutions from verified subject matter experts

Step: 2 Unlock
Step: 3 Unlock

Students Have Also Explored These Related Chemical Engineering Questions!