Question: Question 38 (1 point) in CM@Risk there is a contractual relationship between the CM/GC and the designer Question 38 options: 1) True 2) False Question
Question 38 (1 point)
in CM@Risk there is a contractual relationship between the CM/GC and the designer
Question 38 options:
| 1) True | |
| 2) False |
Question 39 (1 point)
a key advantage for the owner in a CM@Risk is the owner having more professional relationship with the contractor.
Question 39 options:
| 1) True | |
| 2) False |
Question 32 (1 point)
In what type of project delivery system is there a construction manager providing pre-construction services followed by a GMP contract as a general contractor
Question 32 options:
|
|
| ||
|
|
| ||
|
|
| ||
|
|
| ||
|
|
|
Question 33 (1 point)
In what type of project delivery system is the selection method purely objective based on the lowest cost
Question 33 options:
|
|
| ||
|
|
| ||
|
|
| ||
|
|
| ||
|
|
|