Question: Question 4 ) A traffic engineer is evaluating the efficiency of the greenband wave in a coordinated signal corridor along a 1 . 5 -

Question 4)
A traffic engineer is evaluating the efficiency of the greenband wave in a coordinated signal corridor along a 1.5-kilometer section of road. The corridor consists of four signalized intersections spaced 500 meters apart. The signals are synchronized with a cycle length of 120 seconds. The green time at each signal is 45 seconds, and the offset between consecutive signals is 25 seconds.
The posted speed limit along the corridor is \(60\mathrm{~km}/\mathrm{h}\), and traffic flows freely at this speed. During peak hours, the traffic volumes at each intersection are as follows:
a) Draw a time-space diagram showing the progression of the greenband wave for the entire corridor, assuming all vehicles travel at the speed limit.
b) Calculate the width of the greenband (in seconds) at each intersection. (Answer \(=40\mathrm{~s},35\mathrm{~s},30\mathrm{~s}\))
c) Determine the efficiency of the greenband wave at each intersection by calculating the percentage of the cycle length that vehicles can travel through the intersection without stopping (greenband width divided by cycle length).(Answer \(=33\%,29\%,25\%\))
Question 4 ) A traffic engineer is evaluating the

Step by Step Solution

There are 3 Steps involved in it

1 Expert Approved Answer
Step: 1 Unlock blur-text-image
Question Has Been Solved by an Expert!

Get step-by-step solutions from verified subject matter experts

Step: 2 Unlock
Step: 3 Unlock

Students Have Also Explored These Related Civil Engineering Questions!