Question: QUESTION 4 The coordinates and elevation of a newly built beacon P 1 has to be surveyed near a new construction site. To fix the
QUESTION
The coordinates and elevation of a newly built beacon P has to be surveyed near a new
construction site. To fix the height of the new beacon the surveyor did a forward and
return run from the mine benchmark with a precise level. The coordinates were fixed by
observations to three trigonometric beacons.
Available Information:
WG
Observations:
Levelling Fieldbook
Direction Sheet
Station: Beacon P
Calculate:
The final corrected elevation of beacon P If the limits of error for precise levelling
is calculated by Was his levelling within the required limits
Step by Step Solution
There are 3 Steps involved in it
1 Expert Approved Answer
Step: 1 Unlock
Question Has Been Solved by an Expert!
Get step-by-step solutions from verified subject matter experts
Step: 2 Unlock
Step: 3 Unlock
