Question: QUESTION 4 The coordinates and elevation of a newly built beacon P 1 has to be surveyed near a new construction site. To fix the

QUESTION 4
The coordinates and elevation of a newly built beacon P1 has to be surveyed near a new
construction site. To fix the height of the new beacon the surveyor did a forward and
return run from the mine benchmark with a precise level. The coordinates were fixed by
observations to three trigonometric beacons.
Available Information:
WG 27
Observations:
Levelling Fieldbook
Direction Sheet
Station: Beacon P1
Calculate:
4.1 The final corrected elevation of beacon P1. If the limits of error for precise levelling
is calculated by 0.005?2km. Was his levelling within the required limits?
QUESTION 4 The coordinates and elevation of a

Step by Step Solution

There are 3 Steps involved in it

1 Expert Approved Answer
Step: 1 Unlock blur-text-image
Question Has Been Solved by an Expert!

Get step-by-step solutions from verified subject matter experts

Step: 2 Unlock
Step: 3 Unlock

Students Have Also Explored These Related Civil Engineering Questions!