Question: QUESTION 5 [ 2 0 MARKS ] a ) Industrialised Building System ( IBS ) is known as a modern method to improves the conventional

QUESTION 5[20 MARKS]
a) Industrialised Building System (IBS) is known as a modern method to improves the conventional construction method. Define IBS and explain four (4) advantages of applying this system.
[10 Marks]
b) A 4m3 shovel cost RM 127 per hour including the wages to an operator. It is assumed to excavate dry clay under the following stated condition. The maximum digging height of the machine is 10.7 m . Determine the cost per cubic meter.
Total cycle time are 23 second
Height of excavation is 3.1 m
Angle of swing is 60 degrees
Efficiency factor 45 min -hr
[10 Marks]
QUESTION 5 [ 2 0 MARKS ] a ) Industrialised

Step by Step Solution

There are 3 Steps involved in it

1 Expert Approved Answer
Step: 1 Unlock blur-text-image
Question Has Been Solved by an Expert!

Get step-by-step solutions from verified subject matter experts

Step: 2 Unlock
Step: 3 Unlock

Students Have Also Explored These Related Civil Engineering Questions!