Question: Question 5 5 . A scheduling system that assumes the required capacity will NOT always be available is called: a . forward scheduling b .
Question
A scheduling system that assumes the required capacity will NOT always be available is called:
a forward scheduling
b backward scheduling
c infinite scheduling
d finite scheduling
A
B
c
D
Step by Step Solution
There are 3 Steps involved in it
1 Expert Approved Answer
Step: 1 Unlock
Question Has Been Solved by an Expert!
Get step-by-step solutions from verified subject matter experts
Step: 2 Unlock
Step: 3 Unlock
