Question: Question 5 This question is based on the Lasting operation from the Stonehaven case. All operations in the lasting department are performed along a conveyor
Question 5 This question is based on the Lasting operation from the Stonehaven case. All operations in the lasting department are performed along a conveyor line designed to move at a rat that matches the operator's work standards and details given in the table below. There are 5 stations a operators along the conveyor. Processing times for the lasting department Lasting Station 1 - Staple insole Station 2 - Toe and heel seat lasts Station 3-Rough sole, pound Station 4 - Cement shoe, pull last Station 5-Inspect, pack Pun Time (minutes) / Pair 1.4 1.5 2 1.8 0.6 What is the MLT for a batch of 200 shoes at the lasting operations? 409 minutes 408 minutes 410 minutes 410 minutes
Step by Step Solution
There are 3 Steps involved in it
Get step-by-step solutions from verified subject matter experts
