Question: Question A work operation consisting of three elements has been subjected to a stopwatch time study. The observations recorded are shown. By union contract, the
Question
A work operation consisting of three elements has been subjected to a stopwatch time study. The observations recorded are shown. By union contract, the allowance time for the operation is personal time 5%, delay 5% and fatigue 10%. Determine the standard time for the work operation.
CYCLE OBSERVATIONS (IN MINUTES)
| JOB ELEMENT | 1 | 2 | 3 | 4 | 5 | 6 | PERFORMANCE RATING (%) |
| A | 0.1 | 0.1 | 0.2 | 0.9 | 0.2 | 0.1 | 90 |
| B | 0.8 | 0.6 | 0.8 | 0.5 | 3.2 | 0.7 | 110 |
| C | 0.5 | 0.5 | 0.4 | 0.5 | 0.6 | 0.5 | 80 |