Question: Question content area Part 1 As the production planner for Xiangling Hu Products, Inc., you have been given a bill of material for a bracket

Question content area
Part 1
As the production planner for Xiangling Hu Products, Inc., you have been given a bill of material for a bracket that is made up of a base, 22 springss, and 33 clamps. The base is assembled from 22 clampss and 22 housingss. Each clamp has 11 handle and 11 castingnothing. Each housing has 11 bearingnothing and 11 shaftnothing. There is no inventory on hand.
Part 2
a) Design a product structure noting the quantities for each item and show the low-level coding. Match each number in the structure below with the corresponding item.
Number
Item
I
Spring Subscript left parenthesis 2 right parenthesisSpring(2)
II
Housing Subscript left parenthesis 2 right parenthesisHousing(2)
III
Casting Subscript left parenthesis 1 right parenthesisCasting(1)
IV
Shaft Subscript left parenthesis 1 right parenthesisShaft(1)
BracketBracket
Base Subscript left parenthesis 1 right parenthesisBase(1)
Clamp Subscript left parenthesis 2 right parenthesisClamp(2)
Handle Subscript left parenthesis 1 right parenthesisHandle(1)
Clamp Subscript left parenthesis 3 right parenthesisClamp(3)
Bearing Subscript left parenthesis 1 right parenthesisBearing(1)
Handle Subscript left parenthesis 1 right parenthesisHandle(1)
Casting Subscript left parenthesis 1 right parenthesisCasting(1)
III
I
II
IV
Part 3
b) Determine the gross quantities needed of each item if you are to assemble 5050 brackets.

Step by Step Solution

There are 3 Steps involved in it

1 Expert Approved Answer
Step: 1 Unlock blur-text-image
Question Has Been Solved by an Expert!

Get step-by-step solutions from verified subject matter experts

Step: 2 Unlock
Step: 3 Unlock

Students Have Also Explored These Related General Management Questions!