Question: Question Reply Options 1. At what level is the planned Low assessed level of control risk? Moderate Maximum 2. Describe the scope of tests None


Question Reply Options 1. At what level is the planned Low assessed level of control risk? Moderate Maximum 2. Describe the scope of tests None of control that will be Tests performed performed. 3. At what level is the assessed Low level of control risk? Moderate Maximum