Question: Question Three (50 Points) Suppose a quality control chart has been constructed to monitor a critical to quality characteristic of a product. Please, update the

Question Three (50 Points) Suppose a quality

Question Three (50 Points) Suppose a quality control chart has been constructed to monitor a critical to quality characteristic of a product. Please, update the given below control chart by naming all the control limits and correspondence zones and test if sensitizing rules for Shewhart control charts are applicable or not. Please identify the corresponding points if any of the rules is valid. Control Umits & Sigma Levels Zone Names . O Dondente 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34 35 Rule-1: One or more points outside of the control limits Rule-2: Two of three consecutive points outside the Two Sigma warning limits but still inside the control limits Rule-3: Four of five consecutive points beyond the one-sigma limits. Rule-4: A run of eight consecutive points on one side of the center line. Rule-5: Six points in a row steadily increasing or decreasing. Rule-6: Fifteen points in a row in Zone C (both above and below the center line) Rule-7: Fourteen points in a row alternating up and down Rule-8: Eight points in a row on both sides of the center line with none in Zone-C. D

Step by Step Solution

There are 3 Steps involved in it

1 Expert Approved Answer
Step: 1 Unlock blur-text-image
Question Has Been Solved by an Expert!

Get step-by-step solutions from verified subject matter experts

Step: 2 Unlock
Step: 3 Unlock

Students Have Also Explored These Related General Management Questions!