Question: QUESTION TWO [ 2 5 MARKS ] A mini - hydropower station always utilizes two types of turbines, A and B for power generation because

QUESTION TWO [25 MARKS]
A mini-hydropower station always utilizes two types of turbines, A and B for power generation because of the hydrologic nature of the power generation site. A mini hydro generation station was constructed in 1980 in Salah, Oman using turbines A and B that each have a generation capacity of 40 Mega Watts [MW], and 80 Mega Watts [MW]. At the time, there weren't good records kept for the manufacture cost of these types of turbines by the supplier because they were rarely required and these were one of a kind produced to meet that specific order. The company that makes these turbines has separate production lines for each type of turbine but of lower generation capacity and keeps good records of their production costs at its manufacturing plant. Supplier company 1980 records for turbine type A show that it required $8.4 million to produce the 3rd turbine, and $7.8 million to produce the 5th turbine. 1980 records also indicate
that for type B turbine, $17.2 million was used to produce the 8th turbine while $15.7 million was required to produce the 20th turbine.
This cost information provided is for a popular size for type A turbine that has a generation capacity of 8 MW while the popular version of type B turbine has a generation capacity of 16 MW. Sales records since 1980 until to date show that there are approximately four times more type A turbines sold than type B turbines.
It has been determined that the composite index for both types of turbines in 1980 was 450. The following Table summarizes the average cost of type A and type B turbines in 1980 and to date.
\table[[Year,Type A Turbine Average Price [Million $],Type B Turbine Average Price [Million $]],[1980,8.0,15.0],[2024,13.5,23.5]]
A new hydropower project is proposed to be built this year in Salah that will require a 120 MW type A turbine and 250 MW type B turbine. Utilize your knowledge of cost estimation techniques to determine how much should be budgeted for each type of turbine in this project.
QUESTION TWO [ 2 5 MARKS ] A mini - hydropower

Step by Step Solution

There are 3 Steps involved in it

1 Expert Approved Answer
Step: 1 Unlock blur-text-image
Question Has Been Solved by an Expert!

Get step-by-step solutions from verified subject matter experts

Step: 2 Unlock
Step: 3 Unlock

Students Have Also Explored These Related Mechanical Engineering Questions!