Question: question will save this response. Question 3 of 412 Question 3 3 points Seve Antwer You have been asked to balance a flow shop assembly

question will save this response. Question 3 of
question will save this response. Question 3 of 412 Question 3 3 points Seve Antwer You have been asked to balance a flow shop assembly operation to achieve an output rate of 80 units per eight-hour day. Task times and precedence relationships are shown in the table below. Task Predecessor(0) Duration (minutes) A 1.4 B ... 0.8 A, B 0.4 D 1.8 E 0.4 F 2.1 G E.F 2.0 D, G 1.2 H 1. The desired cycle time is 2. The minimum number of stations needed is 3. The total idle time per cycle is minutes workstations