Questions A)Normalize the above database to 1NF,2NF,3NF and Boyce-Codd normal form (BCNF)? B)Show each step taken that
Fantastic news! We've Found the answer you've been seeking!
Question:
Questions
A)Normalize the above database to 1NF,2NF,3NF and Boyce-Codd normal form (BCNF)?
B)Show each step taken that is, movement from one normal form to another?
C)Briefly explain each business rule?
Transcribed Image Text:
Claims Claim_ Bill_N Contract_ Numbe umbe Item_N Number Bill Description umber Item_Description Unit Rate Place Quantity Date wSC 19/20 WSC 19/20 WSC 19/20 wSC 19/20 wsC 19/20 wsC 19/20 wSC 19/20 WSC 19/20 wSC 19/20 wsC 19/20 wsC 19/20 wsC 19/20 wsC 19/20 wsC 19/20 1 Desilting Desilting Desilting Desilting Desilting Desilting Gravelling Gravelling Gravelling Gravelling Gravelling Construct new crossing Upgrade Culvert Crossing Desilting Desilting Desilting Desilting Desilting Excavate Drain And Level Spoil On Site Desilt and clean drain from one side and level spoil on site LM Desilt and clean drain from one side and level spoil on site Desilt and clean drain from one side and level spoil on site LM Desilt and clean drain from one side and level spoil on site Desilt and clean drain from one side and level spoil on site Desilt and clean drain from one side and level spoil on site Gravelling Gravelling $0.50 $0.50 Cautata Dravo 1 1 1006 2/1/2020 1 1 1 LM 247 2/1/2020 Koronivia West 2/1/2020 2/1/2020 2/1/2020 2/1/2020 2/1/2020 2/1/2020 2/1/2020 2/1/2020 2/1/2020 2/1/2020 2/1/2020 4/18/2020 4/18/2020 4/18/2020 4/18/2020 |4/18/2020 2268.33 4/18/2020 1 1 1 $0.50 38 $0.50 $0.50 1 1 1 LM Lakena/Manoca/Buiduna 212 1 1 1 LM Mokani 1500 1 LM $0.50 Waikete 2866 1 3 4 M3 $15.00 Cautata 50 1 4 M3 $15.00 Dravo 15 Gravelling Gravelling Gravelling Construct New Crossing 1 3 4 M3 $15.00 Naila 44.5 $15.00 $15.00 LM $1,000.00 Naila $500.00 Buiduna $0.50 $0.50 $0.50 M3 M3 Naitalasese Waivou 1 3 4 89 1 3 4 29.6 1(b) 1(c) Upgrade culvert crossing Desilt and clean drain from one side and level spoil on site 1 2.88 1 LM 2.88 Lakena/Manoca/Waituri Qaraniki/Naselai Qaraniki/Visama Qumgum 2 1 LM 3662 WSC 19/20 WSC 19/20 WSC 19/20 wsC 19/20 wsC 19/20 1 Desilt and clean drain from one side and level spoil on site Desilt and clean drain from one side and level spoil on site LM Desilt and clean drain from one side and level spoil on site 1 1 LM 3000 2 1 1 3321 2 1 1 LM $0.50 1556 $0.50 $1.50 $1.50 LM $1,000.00 Noco $500.00 Naitasiri $50.00 Waituri $1.00 $1.50 Desilt and clean drain from one side and level spoil on site LM Excavate Drain And Level Spoil On Site Excavate Drain And Level Spoil On Site Construct Flap Gate 2 1 Vuci 4568 2 M3 Qaraniki/Naselai 257.33 4/18/2020 Excavate Drain And Level Spoil On Site Construct new crossing WsC 19/20 wSC 19/20 wSC 19/20 wSC 19/20 WSC 19/20 WSC 19/20 WSC 19/20 WSC 19/20 2 2 1 M3 Vuci 3(c) 1(c) Upgrade culvert crossing Stone Pitching General Excavation Excavate Drain And Level Spoil On Site Excavate Drain And Level Spoil On Site 1(c) Upgrade culvert crossing Stone Pitching General Excavation Excavate Drain And Level Spoil On Site Excavate Drain And Level Spoil On Site Excavate Drain And Level Spoil On Site Excavate Drain And Level Spoil On Site Excavate Drain And Level Spoil On Site 1(c) Upgrade culvert crossing 1(ii) Upgrade of Doors and Components 1(ii) JUpgrade of Doors and Components 4/18/2020 4/18/2020 4/18/2020 4/18/2020 4/19/2020 4/19/2020 4/20/2020 4/20/2020 4/20/2020 4/21/2020 4/21/2020 4/22/2020 2 4 3.1 Upgrade Culvert Crossing Stone Pitching and General Excavation Stone Pitching and General Excavation Excavate Drain And Level Spoil On Site Excavate Drain And Level Spoil On Site Upgrade Culvert Crossing Stone Pitching and General Excavation Stone Pitching and General Excavation Excavate Drain And Level Spoil On Site Excavate Drain And Level Spoil On Site 2 LM M3 2.66 2 5.68 2. 4 M3 Waituri 155 Noco Waituri 3 2 1 M3 300 3 2 1 M3 $1.50 300 LM M3 $500.00 Noco $50.00 2.26 wSC 19/20 wSC 19/20 wsC 19/20 wSC 19/20 wSC 19/20 wSC 19/20 wSC 19/20 wSC 19/20 WSC 20/20 wSC 20/20 3 3 Noco 5 3 4 M3 $1.00 Waituri 20 $1.50 $1.50 $1.50 $1.50 M3 Naila 20 4 2 M3 Vuci 365 Excavate Drain And Level Spoil On Site Excavate Drain And Level Spoil On Site Excavate Drain And Level Spoil On Site Upgrade Culvert Crossing Upgrade Doors And Components Upgrade Doors And Components Buiduna Naila 2 1 562 M3 M3 1 1 4/22/2020 4/22/2020 4/22/2020 4/24/2020 4/25/2020 $1.50 Vuci $500.00 Naila 2 1 M3 10 LM SET $1,000.00 Dravo SET $1,000.00 Vuci 5 2.55 6. 4 6 Claims Claim_ Bill_N Contract_ Numbe umbe Item_N Number Bill Description umber Item_Description Unit Rate Place Quantity Date wSC 19/20 WSC 19/20 WSC 19/20 wSC 19/20 wsC 19/20 wsC 19/20 wSC 19/20 WSC 19/20 wSC 19/20 wsC 19/20 wsC 19/20 wsC 19/20 wsC 19/20 wsC 19/20 1 Desilting Desilting Desilting Desilting Desilting Desilting Gravelling Gravelling Gravelling Gravelling Gravelling Construct new crossing Upgrade Culvert Crossing Desilting Desilting Desilting Desilting Desilting Excavate Drain And Level Spoil On Site Desilt and clean drain from one side and level spoil on site LM Desilt and clean drain from one side and level spoil on site Desilt and clean drain from one side and level spoil on site LM Desilt and clean drain from one side and level spoil on site Desilt and clean drain from one side and level spoil on site Desilt and clean drain from one side and level spoil on site Gravelling Gravelling $0.50 $0.50 Cautata Dravo 1 1 1006 2/1/2020 1 1 1 LM 247 2/1/2020 Koronivia West 2/1/2020 2/1/2020 2/1/2020 2/1/2020 2/1/2020 2/1/2020 2/1/2020 2/1/2020 2/1/2020 2/1/2020 2/1/2020 4/18/2020 4/18/2020 4/18/2020 4/18/2020 |4/18/2020 2268.33 4/18/2020 1 1 1 $0.50 38 $0.50 $0.50 1 1 1 LM Lakena/Manoca/Buiduna 212 1 1 1 LM Mokani 1500 1 LM $0.50 Waikete 2866 1 3 4 M3 $15.00 Cautata 50 1 4 M3 $15.00 Dravo 15 Gravelling Gravelling Gravelling Construct New Crossing 1 3 4 M3 $15.00 Naila 44.5 $15.00 $15.00 LM $1,000.00 Naila $500.00 Buiduna $0.50 $0.50 $0.50 M3 M3 Naitalasese Waivou 1 3 4 89 1 3 4 29.6 1(b) 1(c) Upgrade culvert crossing Desilt and clean drain from one side and level spoil on site 1 2.88 1 LM 2.88 Lakena/Manoca/Waituri Qaraniki/Naselai Qaraniki/Visama Qumgum 2 1 LM 3662 WSC 19/20 WSC 19/20 WSC 19/20 wsC 19/20 wsC 19/20 1 Desilt and clean drain from one side and level spoil on site Desilt and clean drain from one side and level spoil on site LM Desilt and clean drain from one side and level spoil on site 1 1 LM 3000 2 1 1 3321 2 1 1 LM $0.50 1556 $0.50 $1.50 $1.50 LM $1,000.00 Noco $500.00 Naitasiri $50.00 Waituri $1.00 $1.50 Desilt and clean drain from one side and level spoil on site LM Excavate Drain And Level Spoil On Site Excavate Drain And Level Spoil On Site Construct Flap Gate 2 1 Vuci 4568 2 M3 Qaraniki/Naselai 257.33 4/18/2020 Excavate Drain And Level Spoil On Site Construct new crossing WsC 19/20 wSC 19/20 wSC 19/20 wSC 19/20 WSC 19/20 WSC 19/20 WSC 19/20 WSC 19/20 2 2 1 M3 Vuci 3(c) 1(c) Upgrade culvert crossing Stone Pitching General Excavation Excavate Drain And Level Spoil On Site Excavate Drain And Level Spoil On Site 1(c) Upgrade culvert crossing Stone Pitching General Excavation Excavate Drain And Level Spoil On Site Excavate Drain And Level Spoil On Site Excavate Drain And Level Spoil On Site Excavate Drain And Level Spoil On Site Excavate Drain And Level Spoil On Site 1(c) Upgrade culvert crossing 1(ii) Upgrade of Doors and Components 1(ii) JUpgrade of Doors and Components 4/18/2020 4/18/2020 4/18/2020 4/18/2020 4/19/2020 4/19/2020 4/20/2020 4/20/2020 4/20/2020 4/21/2020 4/21/2020 4/22/2020 2 4 3.1 Upgrade Culvert Crossing Stone Pitching and General Excavation Stone Pitching and General Excavation Excavate Drain And Level Spoil On Site Excavate Drain And Level Spoil On Site Upgrade Culvert Crossing Stone Pitching and General Excavation Stone Pitching and General Excavation Excavate Drain And Level Spoil On Site Excavate Drain And Level Spoil On Site 2 LM M3 2.66 2 5.68 2. 4 M3 Waituri 155 Noco Waituri 3 2 1 M3 300 3 2 1 M3 $1.50 300 LM M3 $500.00 Noco $50.00 2.26 wSC 19/20 wSC 19/20 wsC 19/20 wSC 19/20 wSC 19/20 wSC 19/20 wSC 19/20 wSC 19/20 WSC 20/20 wSC 20/20 3 3 Noco 5 3 4 M3 $1.00 Waituri 20 $1.50 $1.50 $1.50 $1.50 M3 Naila 20 4 2 M3 Vuci 365 Excavate Drain And Level Spoil On Site Excavate Drain And Level Spoil On Site Excavate Drain And Level Spoil On Site Upgrade Culvert Crossing Upgrade Doors And Components Upgrade Doors And Components Buiduna Naila 2 1 562 M3 M3 1 1 4/22/2020 4/22/2020 4/22/2020 4/24/2020 4/25/2020 $1.50 Vuci $500.00 Naila 2 1 M3 10 LM SET $1,000.00 Dravo SET $1,000.00 Vuci 5 2.55 6. 4 6
Expert Answer:
Answer rating: 100% (QA)
A Normalization 1NF ContactPlace ContactNumber Place AvailableItems ContactNumber ItemNumber ItemDescription Unit Rate ContactBills ContactNumber BillNumber BillDescription Date ContactClaims ContactN... View the full answer
Related Book For
Essentials of Entrepreneurship and Small Business Management
ISBN: 978-0133849622
8th edition
Authors: Norman M. Scarborough, Jeffrey R. Cornwall
Posted Date:
Students also viewed these databases questions
-
Briefly explain the normal sequence and form of financial reports produced by private companies in a typical year.
-
Briefly explain the normal sequence and form of financial reports produced by public companies in a typical year.
-
Show that this database is arranged in the form of a frame. In particular, how would you use it to gain access to population information for a particular employee?
-
How many circuits are required to accommodate kitchen appliances in an average size home?
-
The reaction in eq. 7.17 occurs by an E2 mechanism (review eqs. 7.22 and 7.23). By what mechanism does the reaction in eq. 8.8 occur? H,sO CH3CHOH + HOCH2CH3 140%. CH,CHOC ethanol diethyl ether
-
The 49 students in a class at the University of Florida made blinded evaluations of pairs of cola drinks. For the 49 comparisons of Coke and Pepsi, Coke was preferred 29 times. In the population that...
-
Stability analysis with heat transfer. Set up the equations for steady state for the Bnard problem. Now perturb the temperature and use an energy equation to derive an equation for the temperature...
-
1. Wages and prices will increase when actual output exceeds potential. __________(True/False) 2. The short run in macroeconomics is the time period over which __________do not adjust to economic...
-
The unadjusted trial balance of Pharoah Exposure Inc. had these balances for the following select accounts: Supplies $3,600. Unearned Service Revenue $8,550, and Prepaid Rent $1,500. At the end of...
-
Aggie Oil Corporation, a new successful efforts company, incurred the following costs and made the other transactions shown below for the years 2018 and 2019. 2018 a. Paid $225,000 for G&G costs...
-
On January 1, 2019, the partner's capital balance in Rosen & Decker Ltd are Jerry Rosen, $27,000 and Patricia Decker, $34,000. For the year ended December 31, 2019, the partnership reports a profit...
-
Motion pictures and television programs are responsible for a misconception about the way in which trials proceed. Explain.
-
How is the legal infrastructure of a country significant for business?
-
How does the operation of an appeal court differ from that of a trial court?
-
Why is it thought necessary for governments to control mergers?
-
What are the advantages that make ADR an attractive means of settling disputes?
-
3. Given the graphs of f(x) = 2x and g(x) = x -1, sketch a graph of the combined function y = the axes below. List a minimum of 4 points. f(x) on g(x) 6 4 2 f(x)=2x 4 20 2 IN 2 + g(x)=x 4 6 x
-
Differentiate the following terms/concepts: a. Personality types and money attitudes b. Planners and avoiders c. Moderating and adapting to biases d. "Perfectible judges" and "incorrigible judges"
-
What types of businesses are most likely to attract venture capital?
-
How does venture capitalist criteria for investing compare to the typical angels criteria?
-
Why must entrepreneurs learn to think globally?
-
Suppose that in September 2013 a company takes a long position in a contract on May 2014 crude oil futures. It closes out its position in March 2014. The futures price (per barrel) is \($88.30\) when...
-
Explain how the control variate technique is implemented.
-
A company wishes to hedge its exposure to a new fuel whose price changes have a 0.6 correlation with gasoline futures price changes. The company will lose $1 million for each 1 cent increase in the...
Study smarter with the SolutionInn App