Question: Radiant Systems allocates manufacturing overhead based on machine hours. Each connector should machine hours. According to the state budget Radiant expected since the foowing 450
Radiant Systems allocates manufacturing overhead based on machine hours. Each connector should machine hours. According to the state budget Radiant expected since the foowing 450 machine hours per month (0 connectors x 8 machine hours per connector) $6,000 in variabile manufacturing overhead costs 50,625 in fed mandaturing overhead costs During August Radiant actually used 1.000 machine hours to make 90 connectors and cont 55,600 in variantung costs and 400 in Red manding overhead cos Radiants vandard m location rate is e d O A $12.50 per machine hour. B. $13.50 per machine hour C. 526.00 per machine hour D. $6.00 per machine hour