Question: Rate, Gap, and Speed Problems: Show all calculations to get full credit. 1) In a continuous motion machine, a vendor has specified that their barcode

Rate, Gap, and Speed Problems: Show all calculations to get full credit. 1) In a continuous motion machine, a vendor has specified that their barcode scanner requires a 10" gap between products. A Brake-Meter-Belt is being used to generate the necessary gap across 2 belt conveyors. Min Product Length: 10" Max Product Length: 36" Average Product Length: 18" A) What speed ratio is required to generate the necessary 10" minimum gap between products? B Using this speed ratio what will the gap be for the Max Product Length? C) What speeds would you use if you need to achieve a rate of 50 Products Per Minut using the average product length? D) What is the \% product density going through the machine? E) Assuming that the heaviest product weight is 25lbs/ft. and the machine is 10 long what is the product live load on the machine at any time? (Live Load = Weight / ft. * Density * Length) F) A customer has specified that for safety reasons no machine may exceed 120FPM, keeping the ratio the same, what does this do to the rate using the average product length
Step by Step Solution
There are 3 Steps involved in it
Get step-by-step solutions from verified subject matter experts
