Question: Refer to Table 6.1-Factors for Computing Control Chart Limits (3.slama) for this problem. Sampling 4 pieces of precision-cut wire to be used in computer assembly)

Refer to Table 6.1-Factors for Computing Control
Refer to Table 6.1-Factors for Computing Control Chart Limits (3.slama) for this problem. Sampling 4 pieces of precision-cut wire to be used in computer assembly) every hour for the past 24 hours has produced the following results: D Hour x R x R 1 2 3 4 5 6. 3.15" 3.20 3.22 3.29 2.97 2.86 0.65" 1.13 1.48 1.31 1.22 0.32 Hour 7 B 19 10 11 12 R 295" 0.48 2.65 1.08 3.12 0.71 2.95 1.38 2.93 1.12 2.87 0.45 Hour 13 14 15 16 17 18 X 3.21" 2.93 3.12 2.94 2.95 2.74 R Hour 0.80 19 1.36 20 1.01 21 0.45 22 1.38 23 1.34 24 4.51 2.99 2.55 328 2.84 2.64 1.66" 1.09 1.13 0.41 1.53 0.92 ce Based on the sampling done, the controllimits for 3-sigma x chart are (round av intermediate calculations to three decimal places before proceeding with further calculations): Upper Control Limit (UCL) - inches (round your response to three decimal places) Lower Control Limit (LCL) - Inches (round your response to three decimal placas) Based on the x-chart, the wire cutting process has been The controllimits for the 3-sigma R-chart are fround all intermediate calculations to three decimal places before proceeding with further calculations) Upper Control Lima (UCL) - inches (round your response to three deomapnons)

Step by Step Solution

There are 3 Steps involved in it

1 Expert Approved Answer
Step: 1 Unlock blur-text-image
Question Has Been Solved by an Expert!

Get step-by-step solutions from verified subject matter experts

Step: 2 Unlock
Step: 3 Unlock

Students Have Also Explored These Related General Management Questions!