Reinforced concrete retaining wall (cantilever retaining wall) kakakakakakakakakakakakakakakakakakakakakakakakakakakakakakakakakakakaka Example (1) Design and illustrate dimensions for erecting...
Fantastic news! We've Found the answer you've been seeking!
Question:
Transcribed Image Text:
Reinforced concrete retaining wall (cantilever retaining wall) kakakakakakakakakakakakakakakakakakakakakakakakakakakakakakakakakakakaka Example (1) Design and illustrate dimensions for erecting a reinforced concrete ( cantilever ) retaining wall of length 19 m, to retain filling earth of average height 7.2 m, and estimate the following quantities for constructing the footing foundation of the wall: A. Quantity of foundation excavation works in (m³), with re-laying of crushed stone of average depth 12 cm B. Quantity of wood shuttering framework of the footing / foundation in (m²) C. Quantity of laying or paving of crushed stone works in (m²) of average depth 12 cm D. Quantity of steel rebars in (ton) E. Quantity of pouring batched-premixed concrete in (m³) of grade M15 for casting foundation of the wall including (key, toe and heel) of the base footing Typical design-drawing of reinforced concrete retaining wall ( cantilever wall ) This type of retaining wall is suitable and more economic for H from (4 to 8 ) m, while counterforts used for greater heights Should be taking in the consideration all specifications and requirements for constructing and set upping (vertical expansion joints and drain weep holes or tile drains with crushed stone filtering) of the wall Stem or Arm Bottom/lower filling or N.G.L h₁= D-d D=H/4 Total depth of foundation-excavation nylon laying or crushed stone paving of thick 10 to 14 cm or gravel paving thick 7 10 12 cm F.B=H/20 Toe H/4 - D T=H/20 17 Top/upper filling or N.G.L 1H 31] For the foundation reinforced concrete of the (key, toe and heel) parts using concrete type B with reinforcing steel bars greater than 130 kg for each cubic meter of concrete, while for the wall (arm) part using concrete type B too, but should be reinforced by steel bars about 140 kg for each cubic meter of concrete 3T 3H/20 (10 to 12: V Crushed stone filter Tile drain Key B=3/4 H base slab or footing width h₁+ H+H/20= Total height of the wall Heel d=H/9 Depth of base slab k-D/3-H/12 Depth of key Reinforced concrete retaining wall (cantilever retaining wall) kakakakakakakakakakakakakakakakakakakakakakakakakakakakakakakakakakakaka Example (1) Design and illustrate dimensions for erecting a reinforced concrete ( cantilever ) retaining wall of length 19 m, to retain filling earth of average height 7.2 m, and estimate the following quantities for constructing the footing foundation of the wall: A. Quantity of foundation excavation works in (m³), with re-laying of crushed stone of average depth 12 cm B. Quantity of wood shuttering framework of the footing / foundation in (m²) C. Quantity of laying or paving of crushed stone works in (m²) of average depth 12 cm D. Quantity of steel rebars in (ton) E. Quantity of pouring batched-premixed concrete in (m³) of grade M15 for casting foundation of the wall including (key, toe and heel) of the base footing Typical design-drawing of reinforced concrete retaining wall ( cantilever wall ) This type of retaining wall is suitable and more economic for H from (4 to 8 ) m, while counterforts used for greater heights Should be taking in the consideration all specifications and requirements for constructing and set upping (vertical expansion joints and drain weep holes or tile drains with crushed stone filtering) of the wall Stem or Arm Bottom/lower filling or N.G.L h₁= D-d D=H/4 Total depth of foundation-excavation nylon laying or crushed stone paving of thick 10 to 14 cm or gravel paving thick 7 10 12 cm F.B=H/20 Toe H/4 - D T=H/20 17 Top/upper filling or N.G.L 1H 31] For the foundation reinforced concrete of the (key, toe and heel) parts using concrete type B with reinforcing steel bars greater than 130 kg for each cubic meter of concrete, while for the wall (arm) part using concrete type B too, but should be reinforced by steel bars about 140 kg for each cubic meter of concrete 3T 3H/20 (10 to 12: V Crushed stone filter Tile drain Key B=3/4 H base slab or footing width h₁+ H+H/20= Total height of the wall Heel d=H/9 Depth of base slab k-D/3-H/12 Depth of key
Expert Answer:
Answer rating: 100% (QA)
To design and estimate quantities for the construction of a reinforced concrete cantilever retaining wall well follow standard engineering practices H... View the full answer
Related Book For
Posted Date:
Students also viewed these civil engineering questions
-
n a) Draw a simple composite section and a non-composite section of a beam b) Given below is an l-section beam. Draw all the views (A, B, C, D and E) with eve possible detail of this beam. E 0
-
Referring to Fig. 5.3, estimate the following quantities for a 20% Cu-80% Ni alloy: (1) Liquidus temperature, (2) Solidus temperature, (3) Percentage of nickel in the liquid at 1400C (2550F), (4) The...
-
Estimate the following quantities without using a calculator. Then find a more precise result, using a calculator if necessary. Discuss whether your approximation technique worked. a. 300,000 100 b....
-
A long, slender bar in the shape of a right circular cone with length L and base diameter d hangs vertically under the action of its own weight (see figure). The weight of the cone is W and the...
-
What are some techniques for resolving conflict?
-
According to Keynes, can the private sector always remove the economy from a recessionary gap? Explain your answer.
-
Think of an experiment to measure diffusion coefficients that you could set up at home or in your apartment. Detail the equipment list. Estimate the amount of change you will observe. Will you be...
-
Investment X offers to pay you $4,300 per year for 9 years, whereas Investment Y offers to pay you $6,100 per year for 5 years. Which of these cash flow streams has the higher present value if the...
-
Open Plains Catering is considering whether to retain or replace its aging delivery truck. The old truck originally cost $52,000 when it was purchased nine years ago. It has a book value of $6,000....
-
Founded in 1972, the German software business SAP (Systems, Applications, and Products in Data Processing) is known as one of the world leaders in enterprise resource planning software, employing...
-
Racie will receive payments of $550 a month for ten years. What are these payments worth today at a discount rate of 6 percent, compounded monthly?
-
2.) A 1200-mH inductor is connected in series with a 200-k2 resistor. This network can be either connected to or disconnected from a 25-V battery through the action of a switch. When the network is...
-
19. A motorboat leaves a harbor and travels at an average speed of 10 mph towards a small island. Two hours later, a cabin cruiser leaves the same harbor at an average speed of 20 mph toward the same...
-
Scenario: You are the designated team leader in charge of heading a committee to address a problem concerning the annual holiday festival to be held on December 15th. The town (population 70,000)...
-
The following information is available for a company s maintenance cost over the last seven months. Month Units Produced Maintenance Cost June 1 0 0 $ 4 , 5 5 0 July 1 9 0 6 , 5 3 0 August 1 1 0 4 ,...
-
How can companies like Strava stay ahead with mobile technology and wearable devices? 2-Claire started using Garmin but dropped this in favour of Strava. What should Strava do to ensure their premium...
-
Create the noise vectors (same size as sound array) as follows: Sinusoidal frequency f1 = 4000 and amplitude A1 = 0.2 Sinusoidal frequency f2 = 5000 and amplitude A1 = 0.25 Now, add the noise vectors...
-
Solve the relation Exz:Solve therelation ne %3D
-
Refer to Figure 10.40. Determine the vertical stress increase, ÎÏz, at point A with the following values: q1 = 90 kN/m; q2 = 325 kN/m; x1 = 4 m; x2 = 2.5 m; z = 3 m. Line load qi Line load...
-
For a given soil, w = 18.2%, Gs = 2.67, and S = 80%. Determine: a. Moist unit weight in kN/m3 b. Volume occupied by water
-
Figure 9.31 shows a concrete dam. Consider Case 1 without the sheet pile, and Case 2 with the sheet pile along the upstream side. a. Draw flow nets for both cases. b. Determine the value of q/k for...
-
International agreements between firms regarding sales, pricing, and other decisions are called _________ agreements.
-
From societys point of view, collusion creates a situation where goods are priced too _________ and outputs too _________.
-
Although collusive oligopolies may be profitable for participants, they are often short lived because firms have a great temptation to _________ on their fellow colluders.
Study smarter with the SolutionInn App