Question: Repeat exercise 10 using contiguous activities. 10. From the following table, draw the precedence network, perform the CPM calculations, and complete the table entries, assuming
Repeat exercise 10 using contiguous activities.
10. From the following table, draw the precedence network, perform the CPM calculations, and complete the table entries, assuming interruptible activities. Activity Duration IPA Type Rela Lag ES EF LS LF TF FF A 3 B 5 A SS 3 2 A D 6 B FF a so C Aif the relationship type is not mentioned, it is finish to start (FS). If no lag is mentioned, it is zero