Question: Repeat exercise 12 using contiguous activities. 12. From the following table, draw the precedence network, perform the CPM calculations, and complete the table entries, assuming

Repeat exercise 12 using contiguous activities.
Repeat exercise 12 using contiguous activities.
12. From the following table, draw the precedence network, perform the CPM calculations, and complete the table entries, assuming interruptible activities. Activity Duration IPA Type Rela Lag ES EF LS LF TF FF A 5 B 7 A SS N C 8 A D 10 A SS 3 FF E 4 B FF 2 F 6 C D E, F G 2 If the relationship type is not mentioned, it is finish to start (FS). If no lag is mentioned, it is zero