Question: ! Required information E 4 - 1 2 and E 4 - 1 3 Bunker makes two types of briefcase, fabric and leather. The company

!
Required information
E4-12 and E4-13
Bunker makes two types of briefcase, fabric and leather. The company is currently using a traditional costing system wi labor hours as the cost driver but is considering switching to an activity-based costing system. In preparation for the possible switch, Bunker has identified two activity cost pools: materials handling and setup. Pertinent data follow:
\table[[,Fabric Case,Leather Case],[Number of labor hours,24,000,11,000],[Number of material moves,777,1,073],[Number of setups,66,154]]
Total estimated overhead costs are $293,300, of which $240,500 is assigned to the materials handling cost pool and $52,800 is assigned to the setup cost pool.
E4-13(Algo) Assigning Costs Using Traditional System, ABC System [LO 4-1,4-3,4-4,4-5,4-6]
Required:
Calculate the overhead assigned to the leather case line using the traditional costing system based on direct labor hours.
Calculate the overhead assigned to the leather case line using ABC.
Was the leather case over- or undercosted by the traditional cost system compared to ABC?
Complete this question by entering your answers in the tabs below.
Required 3
Calculate the overhead assigned to the leather case line using the traditional costing system based on direct labor hours. (Do not round intermediate calculations and round your final answer to the nearest whole dollar amount.)
Overhead Assigned
 ! Required information E4-12 and E4-13 Bunker makes two types of

Step by Step Solution

There are 3 Steps involved in it

1 Expert Approved Answer
Step: 1 Unlock blur-text-image
Question Has Been Solved by an Expert!

Get step-by-step solutions from verified subject matter experts

Step: 2 Unlock
Step: 3 Unlock

Students Have Also Explored These Related Accounting Questions!