Question: Required information Exercise 4-8 Computing ABC Product Costs (L04-2, LO4-3] [The following information applies to the questions displayed below.) Performance Products Corporation makes two products,

 Required information Exercise 4-8 Computing ABC Product Costs (L04-2, LO4-3] [Thefollowing information applies to the questions displayed below.) Performance Products Corporation makes

Required information Exercise 4-8 Computing ABC Product Costs (L04-2, LO4-3] [The following information applies to the questions displayed below.) Performance Products Corporation makes two products, titanium Rims and Posts. Data regarding the two products follow: Direct Labor-Hours per unit 0.40 0.20 Annual Production 20,000 units 80,000 units Rims Posts Additional information about the company follows: a. Rims require $17 in direct materials per unit, and Posts require $10. b. The direct labor wage rate is $16 per hour. c. Rims are more complex to manufacture than Posts and they require special equipment. d. The ABC system has the following activity cost pools: Estimated Activity Activity Cost Pool Machine setups Special processing General factory Activity Measure Number of setups Machine-hours Direct labor-hours Estimated Overhead Cost $ 21,600 $ 180,000 $288,000 Rims 100 4,000 8,000 Posts 80 0 16,000 Total 180 4,000 24,000 Exercise 4-8 Part 2 2. Determine the unit product cost of each product according to the ABC system. (Do not round intermediate calculations. Round your final answers to 2 decimal places.) Kunkel Company makes two products and uses a conventional costing system in which a single plantwide predetermined overhead rate is computed based on direct labor-hours. Data for the two products for the upcoming year follow: Direct materials cost per unit Direct labor cost per unit Direct labor-hours per unit Number of units produced Mercon $ 10.00 $ 3.00 0.20 10,000 Wurcon $ 8.00 $ 3.75 0.25 40,000 These products are customized to some degree for specific customers. Required: 1. The company's manufacturing overhead costs for the year are expected to be $336,000. Using the company's conventional costing system, compute the unit product costs for the two products. 2. Management is considering an activity-based costing system in which half of the overhead would continue to be allocated on the basis of direct labor-hours and half would be allocated on the basis of engineering design time. This time is expected to be distributed as follows during the upcoming year: Mercon 4,000 Wurcon 4,000 Total 8,000 Engineering design time (in hours) Compute the unit product costs for the two products using the proposed ABC system. (For all requirements, do not round intermediate calculations. Round your final answers to 2 decimal places.)

Step by Step Solution

There are 3 Steps involved in it

1 Expert Approved Answer
Step: 1 Unlock blur-text-image
Question Has Been Solved by an Expert!

Get step-by-step solutions from verified subject matter experts

Step: 2 Unlock
Step: 3 Unlock

Students Have Also Explored These Related Accounting Questions!