Question: ! Required information Two full - sized a c - m m boords ore noiled to a b c - m m board and the

!
Required information
Two full-sized ac-mm boords ore noiled to abc-mm board and the resulting beom that is subjected to a vertical shear of 1500N. Knowing that the allowable shearing force in each nail is 135N, determine the allowable spacing sthat can be used between esch pair of nails. Asume a=45mm,b=45mm and c=90mm.
The centroidal moment of inertic, of the cross-section, is given as 10-6(m4)