Question: Review the project description provided below and answer the question that follows: Sea-Cliff Bridge - New South Wales (NSW), Australia Sea-cliff bridge project was undertaken

Review the project description provided below and answer the question that follows: Sea-Cliff Bridge - New South Wales (NSW), Australia Sea-cliff bridge project was undertaken to address the difficulties faced by the community due to constant road closures. The scope of work included a road upgrade of nearly one kilometre, including the bridge with a total length of 665 meters, a mudslide chute and catchment basin, significant rock face reshaping and stabilisation works, as well as access roads of various grades. This project had to over come a number of significant technical hurdles. For example, the complexity of the balanced curved bridge design meant that each constructed five-metre segment had different angles, falls, slope and post-tensioning characteristics. This necessitated a high level of precision, first, in surveying of the preceding segment and, then, in the placement calculations, so that when concrete was poured into the carefully located traveller formwork, it was in the right position to be tensioned and become part of the advancing cantilever structure. The complexity of the varied nature of the five geo-technical domains across the site meant that each afforded a different risk level, due to both changes in the topography and the nature of the underlying geological strata. Apart from these technical challenges, there were a number of other challenges related to the management of resources, schedule and stakeholders. For example, given the nature of terrain, organisation of resources posed a major logistical challenge with flow on effects on schedule, which then caused further difficulties in relation to stakeholder management, as well. The project was delivered under an alliance agreement between the NSW Road and Traffic Authority and private sector companies at a cost of $52 million. It suffered zero lost-time injuries from 285,000 man-hours and featured not less than 135 separate innovations. Provide a succinct and complete account of project objectives to be included in the scope statement of this project