Question: Road Design assignment The objective of this assignment is to apply what you have learned to design a road connecting two existing roads. The attached

Road Design assignment
The objective of this assignment is to apply what you have learned to design a road connecting
two existing roads. The attached map shows the tangents (in bold) that you will use in your
design. You will need to design one horizontal curve and a complete vertical alignment.
Design criteria for the entire alignment
Design speed is 55MPH.
2 lane undivided road (1 lane each direction) with 12' lanes.
The road should have 6' shoulders.
ROW is 50'.
Crown: 14"/foot
Shoulder slope: 3%
Maximum side slopes: 3:1(this is the slope from the shoulder to existing ground in X-section
view). If you need steeper than a 3:1 slope to meet existing ground, you will assume guard rail is
required. You'll need to identify what slope is required if steeper than 3:1 only for locations
where you draw cross sections (see below)
Maximum grades: 8%
Maximum superelevation is 6%
You should consider sight distance.
Note: the road should be near level at the intersections with the existing two roads.
Required
Plan and profile sheet(s) of the horizontal and vertical alignment. This can be done directly on
the topo map provided or you may want to transfer to a separate sheet.
A sample plan and profile sheet is shown in Figure 7.2 in the text.
All drawings must be drawn to scale (make sure you specify the scale). They should be neatly
drawn BY HAND using a straight edge and other drawing aids as appropriate.
Horizontal Alignment. For the horizontal alignment, the design should
be stationed appropriately, and include curve details. For stationing, I suggest tick marks every
100' and station labels every 500'. You must also include station labels at the PC, PI, PT, etc.
Vertical Alignment. For the vertical alignment, your design should try to minimize
earthwork. You should exaggerate the vertical scale. Be sure to include the grades and critical
vertical curve info. You will likely need more than 1 vertical curve.
Sample cross sections. You must include a sheet(s) that show cross sections for station 0+00,
the PC, and first whole station after the PC. Don't forget to consider superelevation. This
should on engineering paper.
Other. Make sure that you include any calculations that you made. You must show that you
have adequate sight distance through your vertical curves. One more note, you will need to
interpolate elevations from the contour map.
please show final design drawing
Road Design assignment The objective of this

Step by Step Solution

There are 3 Steps involved in it

1 Expert Approved Answer
Step: 1 Unlock blur-text-image
Question Has Been Solved by an Expert!

Get step-by-step solutions from verified subject matter experts

Step: 2 Unlock
Step: 3 Unlock

Students Have Also Explored These Related Civil Engineering Questions!