Question: Ru 7 R2 R3 For the parallel production process shown above, R = 0.95, R2 = 0.85, R3 = 0.97. For the given parallel production

Ru 7 R2 R3 For the parallel production process

Ru 7 R2 R3 For the parallel production process shown above, R = 0.95, R2 = 0.85, R3 = 0.97. For the given parallel production process, the reliability - % (enter your response as a percentage rounded to two decimal places)