Question: a R. R For the parallel production process shown above, R, = 0.95, R2 = 0.90, Ra=0.98. For the given parallel production process, the reliability

a R. R For the parallel production process shown
a R. R For the parallel production process shown above, R, = 0.95, R2 = 0.90, Ra=0.98. For the given parallel production process, the reliability = % (enter your response as a percentage rounded to two decimal places) N