Question: , Run at least 100 simulations in excel for Activity A. The estimated average of the duration of this activity is: 8 1.33 10.56 3.08
,
Run at least 100 simulations in excel for Activity A. The estimated average of the duration of this activity is:
8
1.33
10.56
3.08
6.54
A project has three activities A, B, and C that must be carried out sequentially. The probability distributions of the times required to complete activities A, B, and C are uniformly distributed in intervals (1,5], [2,3] and [3,6] respectively. Run at least 100 simulations in ExcelStep by Step Solution