Question: Same Case as Above: A production process at South Plains Manufacturing is shown below. The drilling operation occurs separately from, and simultaneously with, sawing and


Same Case as Above: A production process at South Plains Manufacturing is shown below. The drilling operation occurs separately from, and simultaneously with, sawing and sanding, which are independent and sequential operations. A product needs to go through only one of three assembly operations (the operations are in parallel). What is the bottleneck time? IMPORTANT NOTE: given below is the Capacity per Operation. You need to convert each one of them to Process Times (min/unit) Select an answer and submit. For keyboard navigation, use the up/down arrow keys to select an answer. a 6 minutes/unit b 10 minutes/unit c 15 minutes/unit d 30 minutes/unit e 45 minutes/unit Homework Unanswered Due Sep 19th, 7:00 AM Same Case as Above: A production process at South Plains Manufacturing is shown below. The drilling operation occurs separately from, and simultaneously with, sawing and sanding, which are independent and sequential operations. A product needs to go through only one of three assembly operations (the operations are in parallel). What is the Throughput time for the overall system? IMPORTANT NOTE: given below is the Capacity per Operation. You need to convert each one of them to Process Times (min/unit) Select an answer and submit. For keyboard navigation, use the up/down arrow keys to select an answer. a 14.7 minutes/unit b 18.5 minutes/unit c 85.71 minutes/unit d 140.71 minutes/unit e 332.14 minutes/unit
Step by Step Solution
There are 3 Steps involved in it
Get step-by-step solutions from verified subject matter experts
