Question: Scenario: A Request for Proposal (RFP) by First Nations Health Authority (FNHA) is available on BC-bid site for a project called, Office Building Project. The

Scenario: A Request for Proposal (RFP) by First Nations Health Authority (FNHA) is available on BC-bid site for a project called, Office Building Project. The projects objective is to build a mid-level 50,000 square feet office building in Northern BC. 8 acre site selected by FNHA. Business case based on benefits of having a nurse office building in order to provide in-person medical services to Northern BC First Nations people. FNHA is seeking an independent contractor to design and construct the office building. You are an independent contractor and your project objective is to bid on the Office Building Project RFP. If you become the successful vendor, you will be the independent contractor who will work with a design and construction contractor. Contract will be lump-sum contract to a single contractor of $8M. As part of your bid, you need to develop the scope baseline which is the product scope for the bid project. The product acceptance criteria is all the criteria we learned in this course in regards to Scope baseline.

Part 2: DWBS Your initial draft of DWBS looks like the following: 1 Office Building Project 1.1 Project Management 1.2 Design 1.3 Procurement 1.4 Construction You also had a plan to further decompose each subdivision as follows: 1.1.1 Project Management and Control 1.2.1 Design Civil 1.3.1 Procure Subcontracting 1.4.1 Prepare Site 1.1.2 Develop Project Scope Statement 1.2.2 Design Electrical 1.3.2 Procure Bulk Material 1.4.2 Put Structure in place 1.1.3 Develop DWBS 1.2.3 Design Mechanical 1.3.4 Procure Construction Support Material 1.4.3 Work on Electrical 1.1.4 Develop DWBS Dictionary 1.2.4 Design Structural 1.4.4 Construct MEP Systems 1.2.5 Design Architecture 1.4.5 Finish Interior 1.2.6 Design Plumbing 1.4.6 Finish Exterior Your initial draft and your plan for decomposition have issues in regards to having a good DWBS. Fix the issues and develop a final DWBS that has control account at level 1. o Control account at level 1. Your DWBS needs to be in a hierarchical format.

Step by Step Solution

There are 3 Steps involved in it

1 Expert Approved Answer
Step: 1 Unlock blur-text-image
Question Has Been Solved by an Expert!

Get step-by-step solutions from verified subject matter experts

Step: 2 Unlock
Step: 3 Unlock

Students Have Also Explored These Related General Management Questions!